|
|
Small-Batch Urgent Customization of Thick-Walled U-Tubes—All for Customer NeedsIn mid-March, our company received an urgent procurement request from an equipment manufacturer. Due to maintenance work on Great Wall Energy’s recirculating gas cooler, 40 U-tubes were urgently needed, complying with the GB/T6479-2013 & NB/T47019-2021 standards. The requirements included:
This order posed multiple challenges:
To meet these demands, we conducted a comprehensive assessment of technical specifications, standard requirements, and equipment limitations. We meticulously reviewed and confirmed every step—from piercing and heat treatment processes to mold design and trial bending—overcoming numerous difficulties in small-batch customization. The final U-bend tubes met all performance and testing requirements, and we successfully delivered them within the 20-day deadline, helping the customer secure more time for equipment manufacturing.
Article classification:
公司新闻
|